Phase 1: desktop study

An assessment of risks from contamination based upon historic, geological, environmental data and includes a site walkover.

Turnaround is typically within five working days.

Phase 2: sample collection and analysis

Soil and possibly water samples are taken from the site and tested by an accredited laboratory.

The results are analysed and the contamination risk determined.

Turnaround is typically within 12-15 working days, including laboratory analysis time.

Phase 3: remediation strategy

If potentially contaminated a strategy to remediate the site is required.

Turnaround is typically within five working days.

Phase 4: remediation inspection

An inspection and validation report is required to verify the Phase 3 remediation strategy has been followed.

Turnaround is typically within five working days.